Plan the quantity split before asking for a unit price

For a wholesale clothing programme, total quantity alone is not enough to assess an order. Break the plan into styles, colours and sizes, then identify the arrival window and any replenishment requirement. Ask the supplier which minimums apply at each level and which materials or custom details affect them.

Connect the line sheet to the purchase matrix

Keep commercial style names linked to production style codes, colour references and size quantities. A change to a buyer-facing option should also update the sourcing and packing records. Separate confirmed orders from forecasts so the supplier can assess actual requirements.

Plan repeat availability before relying on replenishment

Distinguish core items you intend to repeat from limited seasonal styles. Ask which materials and components are repeatable and what needs renewed approval. The collection plan should identify reorder questions without presenting a forecast as a purchase commitment.

Build a style, colour and size matrix

  • Style reference and specification version:
  • Colour reference and material option:
  • Size range and quantity per size:
  • Total quantity per style and colour:
  • Branding, ticketing and packing by sales channel:
  • Required arrival window and destination:
  • Initial order versus possible repeat-order requirement:

Example: one total can describe very different orders

Illustrative planning example, not a supplier offer: 600 garments in one style and two colours has a different sourcing structure from 600 garments divided across six styles and five colours. The second plan creates more style-colour combinations and potentially more material, setup and development requirements. Ask for a feasibility review of the matrix instead of assuming the same unit price or minimums.

Choose where to add variety

Identify the styles and colours that matter most to the launch. If the range is too fragmented, ask whether fewer colours, shared materials or common trims could simplify sourcing. Evaluate the effect on customer choice and brand presentation. Do not change fabric simply to meet a minimum without reviewing handfeel, fit and decoration compatibility.

Treat reorders as a separate sourcing decision

Ask whether the same fabric, shade, trims and branding components can be sourced again, and what minimums apply. A previous production run does not guarantee immediate repeat availability. Retain the approved specification and sample references; discuss material changes and any new approval evidence before placing a repeat order.

Work backwards from the selling window

Separate the required arrival date from the production completion date. Ask what must be approved before the schedule can be confirmed, including materials, samples, quantity split and packing. Identify whether a phased shipment is useful and request its separate cost and timing implications. Keep transport and destination handling in the delivery plan.

Copy this wholesale enquiry

We are planning [initial order / reorder] for [market/channel]. Attached is our quantity matrix by style, colour and size, with references and branding requirements. Please identify applicable minimums, material constraints, development requirements and packing assumptions. Our required arrival window is [window] at [destination]. Please also explain what would need reconfirmation for a later repeat order.

Questions buyers ask

Can sizes be mixed within a minimum quantity?

Ask how the supplier applies minimums by style, colour, material and size. Confirm the accepted split for your actual order.

Can a reorder use the same approved sample?

Retain it as a reference, but confirm whether materials, construction or requirements have changed and what needs renewed approval.

Review your assortment with the supplier

Send the quantity matrix, style references, delivery destination and selling window through the project enquiry form. Explore product categories and private-label services. Quantities, prices and delivery dates need confirmation against the complete brief.

Related buying decisions

Further reading

. Review this alongside the project-specific specification; supplier examples are not Yumulin commitments.