Sampling & production: approve the garment before scaling it
Use samples to test the specification, resolve revisions and establish the production reference. Bulk production begins from agreed details, not assumptions left over from development.

Make the first sample answer the right questions
The first sample makes the design tangible. Check the silhouette, balance, movement and construction against the brief, then review the measurements and details that matter to your customer. Evaluate the whole garment as well as individual numbers.
Confirm which materials were used. If a substitute fabric or trim was agreed for the first sample, separate the conclusions you can draw from those that still depend on production materials. Fit approval should not be treated as final approval of an untested fabric, colour or decorated area.
- Measure from the agreed points using the same method as the specification.
- Review movement, proportions, seams, pockets and closure details.
- Check artwork, labels and trims that are included at this stage.
Outcome: a documented review that distinguishes approved details from revisions and pending approvals.

Keep revisions clear and versioned
A useful revision note identifies the current result, the desired result and the exact area to change. Mark photographs or the measurement chart and collect comments from your team into one list. Conflicting instructions in separate messages can lead to a sample that solves one problem while creating another.
Review how a change affects the rest of the garment. Increasing body width, changing fabric stretch or moving a seam can affect fit and construction elsewhere. Record the updated specification and decide which changes require another sample before approval.
- Identify the sample date or version being reviewed.
- Give each revision a location, measurement or annotated reference.
- Confirm that accepted changes are reflected in the current specification.
Outcome: one approved version that the buyer and production team can both identify, with no unresolved revision list.

Confirm the production start conditions
Sample approval is one part of production release. Also confirm the final fabric and trims, colours, quantity by size, decoration, label content and packing instructions. Agree the price scope, production schedule and any inspection or testing arrangements before the order proceeds.
The schedule depends on the confirmed scope and material availability. Distinguish sampling time, bulk production time and transport time when planning a launch. If the garment or material changes after approval, review the revised work and timing before implementing the change.
- Reference: approved sample and current written specification.
- Order: colour and size breakdown, commercial terms and material approvals.
- Controls: agreed inspection scope and packing requirements.
Next step: carry the approved reference into quality inspection so checks measure the order you approved.